| Sn |
Name of Projects |
Type of Work |
Client |
Completion Year |
| 1 |
60
km. 33 Kv Transmission Line, 5th Power Project. |
Detailed
Engineering Survey and Soil Testing |
NEA/HMG |
1986 |
| 2 |
64
Km. 33 Kv Transmission Line, 6th Power Project. |
Detailed
Engineering Survey and Soil Testing |
NEA/HMG |
1986 |
| 3 |
132kv
Transmission Line Survey for 132 Kv T/L from Chisapani-Choumala |
Detailed
Engineering Survey and Soil Testing |
NEA/HMG |
1988 |
| 4 |
Devighat-Dhading
, Damauli- Besishahar and Tansen-Ridi-Tamghas, 33 KV T/L |
Detailed Design |
NEA/HMG |
1988 |
| 5 |
Pancheswor
Multipurpose Project(Joint Venture with four other firms as consortium) |
Project Definition
Study |
PMP |
1992 |
| 6 |
Micro
-hydropower in Khotang District. |
Inventory Study |
WECS/UNDP |
1994 |
| 7 |
Kali
Gandaki "A" Hydroelectric project (Jointly with Morrison Kundsen,
Norconsult & IVO International as member of consortium of Nepalese
Consultants) |
Detailed Design |
NEA/ADB/MK |
1994 |
| 8 |
Khotang
Small Hydropower Project (2300KW) |
Detailed Design |
SHPD |
1995 |
| 9 |
Energy
Resource and Consumption Profile of the Mid -Western Development Region
(MWDR) of
Nepal
|
Research Study |
WECS |
1995 |
| 10 |
Role
of Woman in Water & Energy Sector in MWDR |
Research Study |
WISP/WECS |
1995 |
| 11 |
Middle
Marsyangdi Hydro Electricity Project (In association with LAHMEYER
International) |
Upgrading of
Feasibility Study |
NEA/kfw |
1997 |
| 12 |
Naugarh
Gad Small Hydropower Project (1.8 MW) , Darchula District (In association
with WRC) |
Detailed Design |
NEA/SHMPP |
1998 |
| 13 |
Kabeli
-"A" Hydropower Project (30MW) , Panchthar District (in
association with HES) |
Feasibility and
EIA Study |
NEA/SHSP/CIWEC |
1998 |
| 14 |
Gandhi
Gad SHP Project (1.8 MW), Gorkha District (in association with WRC) |
Detailed Design |
NEA/SHMPP |
1998 |
| 15 |
Detail
Feasibility Study & EIA Study of Mardi Khola Small Hydropower Project
(3.2 MW), Kaski District
|
Detail Feasibility
Design & EIA Study
|
Gandaki Hydropower
(P) Ltd.
|
2002
|
| 16 |
Preparation
of Norms/Standards for Study of Hydropower Project
|
Preparation of
Standards & Manual
|
DOED
|
2002
|
| 17 |
Maya
Khola Hydropower Project, Sankhusabha District
|
Detail Feasibility
Design & EIA Study
|
IRE under DOED,
GON
|
2006
|
| 18 |
Lower
Solu Hydropower Project, Solukhumbu District
|
Detail Feasibility
& EIA Study
|
DOED
|
2006
|
| 19 |
Preparation
of Water Conveyance System Design Guidelines for Hydropower Projects
|
Guidelines &
Manual Preparation
|
DOED
|
2006
|